Runwei is live end to end: entrepreneurs come in, get matched to funding, and partners see the results.
371.5Hands-on hours January 1 – November 27, anchored to the record; a minimum
218.2AI build time September – November 27; separate, never added to hands-on
287Deliverables shipped or sent since July 22
637Changes merged across 25 Runwei repositories since July 22
1,543Live opportunities on November 27
Executive summary
Runwei brings entrepreneurs and partners in through partner microsites and one profile, matches them to 1,543 live funding opportunities, and reports results back to partners.
This report covers January 1 to November 27, 2026; the platform build ran from July 22.
JMCB put in at least 371.5 hands-on hours, shipped 287 deliverables and merged 637 changes; 218.2 hours of AI build time are counted separately.
Decisions needed from you
The LinkedIn opportunities plan: four decisions, sent November 25.
Privacy wording for connected inboxes: draft ready November 27.
Server administrator access for the next platform step.
IntakeOne profile, with consent, for every entrepreneur.OpportunitiesMatched funding cards, each with a fit label.ImpactThe partner impact report (sample data).
Hours by month
Month
Hands-on hours
AI build time
January
21.8
–
February
22.3
–
March
20.5
–
April
14.4
–
May
3.3
–
June
7.7
–
July
25.5
–
August
37.9
–
September
60.6
42.3
October
70.4
78.7
November, to the 27th
87.1
97.2
Total
371.5
218.2
Hands-on AI build time
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
These are minimums. Hands-on hours are Jermaine’s own time, each minute tied to a commit, an email, a working session or a calendar meeting. January to June are mostly meetings, email and commits, because the working-session record only starts in June, and calls are not counted in any month. “–” means not measurable. AI build time is the time AI build agents ran under his direction; no session records survive before September, so earlier months cannot be measured.
What was accomplished
November
Intake. Granted for Growth and the Watson Institute each have their own pages, and partners can add their team and edit their own microsites.
Opportunities. Thirty new state sources, contracts and foundations widen the catalog; listings that charge entrepreneurs a fee are taken down.
Opportunities. Runa is repaired and graded by a test suite, and matching keeps US entrepreneurs on funding in their state or nationwide.
Opportunities. Joshua, Sam and Advantage Insights are built and ready to be switched on.
Impact. Ward Infinity progress reports are finished, and every outcome is now recorded per entrepreneur.
October
Intake. Runwei staff can build and publish partner microsites with no JMCB step, each with a ready launch kit.
Intake. New pages for LDCENY, Queens Public Library, Beyond the Block and Johns Hopkins Ward Infinity.
Opportunities. An AI reviewer, taught by Runwei’s own review decisions, cut the review queue from 912 to 236.
Opportunities. Every listing is labeled by who it is for, so entrepreneurs see their funding first.
Impact. Partner dashboards show microsite registrations and Smart Apply activity.
September
Intake. 26 NYS EAC partners onboarded, and the waitlist pipeline staged 26,528 people for return invitations.
Opportunities. Entrepreneurs see recommendations ranked by fit, with the reasons, plus Smart Apply.
Impact. The partner Impact and ROI dashboard and the engagement funnel reports went live.
Platform. Every approved change now releases itself and is checked automatically after release.
August
Opportunities. Extraction accuracy rose from 7% to 85% on Runwei’s own tests.
Opportunities. Fit scoring and ranked search built for the catalog.
Intake. The Certification Notetaker went live for DBE and ACDBE applicants.
Impact. Engagement tracking laid the base for every later outcome report.
July
Intake. Sign-in on runwei.io fixed in production, so members could log in again.
Opportunities. The Opportunity Grabber prepared for its store listing, and the extraction work begun.
Platform. An as-built review of the platform set the path to production.
Early 2026: January – June
Impact. Johns Hopkins Ward Infinity accelerator sessions and office hours with Runwei (January – February), the start of the Ward Infinity relationship.
Intake. Partner conversations with Bowie State (March) and The DM Firm (May).
Opportunities. A working session with Capital One (April), ahead of the Pro Bono scoping.
Platform. Regular working sessions with Runwei’s team and interns on the platform and roadmap (February – June).
What’s outstanding
Item
Owner
Status
Target
LinkedIn opportunities plan: four decisions
Aixa
Sent Nov 25, waiting
Set with Aixa
Privacy wording for connected inboxes
Aixa
Draft ready Nov 27
Set with Aixa
Server administrator access for the next platform step
Aixa
Requested
Set with Aixa
SOC 2 readiness budget
Aixa
Plan drafted Nov 27
Readiness Dec 2026 – Feb 2027 (estimate)
Which switched-off features go first
Aixa
Built
Set with Aixa
Ward Infinity data-sharing agreement
Aixa, JMCB
Open
Before the first named report
Google approval to read connected inboxes
Google
After the privacy wording
About 4–8 weeks after submission (estimate)
Switch on the LinkedIn review queue
JMCB
Built
Same day as Aixa’s yes
Reviewed dry run for foundation, city and county, CDFI and corporate sources
JMCB
Built, off
Next
Forwarding inbox for opportunity emails
JMCB
Designed
About 1 week once started (estimate)
Risks
Built but not yet on. Joshua, Sam, Advantage Insights and the partner impact feed deliver value only once Runwei switches them on.
Outside timelines. Google sets the pace for inbox reading; that review takes weeks.
Review capacity. New source families widen the catalog only as fast as listings can be reviewed.
Partner uptake. Partner reports show value once partners bring their entrepreneurs onto Runwei.
Detailed log
Every deliverable since July 22, by date, with the change that shipped it. Open a period to see its rows. In the reference column, api is the platform, www is runwei.io, admin is the admin portal, events is the event pages, chat is the assistants, and the number is the change.
November 22 – 27
Aixa’s November 26–27 asks, all done the same day; the Granted for Growth kickoff; and matching that keeps US entrepreneurs on funding they can use.
Intake
Date
Deliverable
PR or run
Status
Nov 24–27
Granted for Growth kickoff questions page. At Aixa’s request the three main answers are preset, the acknowledgement is pre-ticked, and the date reads “Series TBA, Grant Lounge first Monday, 9:00 AM ET.”
api #462, #463 · events #50–#53 · server run
Live
Nov 25
Partner team logins. The Granted for Growth lead added as manager of the partner account, with no email sent; each partner page now lists its team.
api #467, #468 · admin #112 · server run
Live
Nov 25
Editors for paid partners: they can update their own microsite and event pages.
api #469 · admin #113
Merged
Nov 27
Race and ethnicity is now multi-select on My Profile, and the profile wizard moves on after the last step (Aixa’s video). A save that fails keeps the entrepreneur on the same step.
api #477 · www #118 · admin #115
Live
Nov 27
“Connect Gmail” is always visible in chat settings, and Joshua gives a plain answer when Gmail isn’t connected, instead of an error.
chat #50 · www #117, #121
LiveInbox reading waits on Google
Opportunities
Date
Deliverable
PR or run
Status
Nov 22
Runa finds contracts however the entrepreneur asks for them.
chat #42
Live
Nov 22–23
Live quality tests of Joshua, Runa and Sam, with two rounds of fixes: tax-credit questions routed correctly, triage drafts, phishing spotted, meeting notes.
api #440–#445 · chat #43, #45, #46
Live
Nov 22, 27
Certification Notetaker: the capability statement PDF prints Arabic, and the fellows’ November 26 retest is fixed.
notetaker #34, #35
Merged
Nov 23
Matching for US entrepreneurs: the search box ranks by relevance, fit uses only real fit signals, and the default feed and Runa’s picks cover the entrepreneur’s state plus national programs.
www #113 · api #448, #451 · chat #47, #48
Live
Nov 23
Every eligibility tag, award amount and loan type must be backed by the source page. Federal programs are listed nationwide; state programs stay in their state. Existing listings were re-tagged.
api #446, #447, #449, #450 · three server runs
Live
Nov 23
Smart Apply says plainly that Runwei does not write or send the application.
www #112
Live
Nov 25
Opportunities from LinkedIn: a paste-in screen and a review queue, built behind a switch. The scope went to Aixa on November 25 with four decisions.
api #470 · admin #114 · ingest #12
Built, waiting on Aixa
Nov 26–27
Listings that charge the entrepreneur a fee are taken down. Both HerRise rows were withdrawn; the fee check now reads the funder’s own application page, and a sweep withdrew 9 more.
api #475, #476 · two server runs
Live
Impact
Date
Deliverable
PR or run
Status
Nov 23
Public funding posts are short teasers that keep the award amount and link back to Runwei.
api #457, #458
Live
Nov 27
Data care: admin exports never include passwords or sign-in tokens, and the public click counter can’t be flooded.
api #472, #478
Live
November 14 – 21
We repaired Runa and now measure it, added thirty new state sources and public opportunity pages, and built the scope of work for Joshua, Runa and Sam behind switches, so each can be turned on when Runwei is ready.
Intake
Date
Deliverable
PR or run
Status
Nov 16–18
Business profile adds team size, revenue and funding bands, with a baseline snapshot, so later results can be measured against the starting point.
api #379 · www #96
Live
Nov 16–20
Joshua, Chief of Staff: each member’s task list, an onboarding conversation one question at a time, goals with measurable results and a 12-week plan, and meeting notes.
Inbox consent: each entrepreneur says yes before Joshua reads their inbox, with read-only access and a plain privacy notice.
chat #20 · www #88
Built, switched off
Nov 18
Home, login and About pages redesigned in Runwei’s voice, with a sharper home image, labeled login fields and floating buttons kept clear of the page.
www #98–#101
Live
Opportunities
Date
Deliverable
PR or run
Status
Nov 14–15
Runa’s chat outage fixed. It now says honestly when something fails, widens a search that finds nothing one filter at a time, stays on topic, and shows no duplicate cards. A search test suite now grades every change.
chat #11, #13–#18 · www #84 · api #359, #360
Live
Nov 15
Thirty new state sources across the Midwest, South, West and Northeast, wired into publishing and coverage reports.
api #369–#373
Live
Nov 15
Every opportunity carries a state (a state, multi-state, Nationwide or International), and the state filter finds every state, with live counts.
api #374–#376 · www #87
Live
Nov 16
Opportunity Grabber: every extraction had been failing. Fixed, and errors now say what happened and what to do.
extractor #9 · api #392
Live
Nov 16–18
Advantage Insights: an explainable match score, a readiness check and the gaps to close, on each opportunity card.
chat #31 · www #94
Built, switched off
Nov 16–18
Sam: tax-credit guidance grounded in the source, a hand-off to a person, and a home-page panel of credits and deadlines.
chat #28 · www #93
Built, switched off
Nov 16–21
Quality tests for Joshua, Runa and Sam, a live test runner with measured cost, and a guard against hostile instructions hidden in messages, applied to everything the assistants read.
chat #25, #29, #40, #41
Running
Nov 18–19
Public opportunity pages that can be shared (name, value and deadline), with a proper “not found” page. The opportunities page is accessible, has mobile filters, and its pages never repeat or skip a listing.
api #399–#401, #403 · www #102, #104, #105
Live
Nov 19
Faster sourcing: federal grants checked every two hours, newest first. Staff edits to imported listings survive the next import.
api #413, #414
Live
Nov 19–20
A cleaner catalog: 88 federal grants that were listed twice are now one card each; certifications, advisory services and equity funds are held back as not funding; institutions get their own tab.
Certification Notetaker: Arabic fixes from the November 12 graduate test and 12 fixes from the November 18–19 retest.
notetaker #31–#33
Merged
Nov 20–21
More sources: SAM.gov contracts, Pennsylvania, Oklahoma, Wyoming and Oregon programs. Foundations, city and county, CDFI and corporate sources are built but stay off until a reviewed dry run.
api #410, #420, #422, #424–#427, #433, #434
LiveTwo source families off
Nov 21
Aixa’s rule applied: no listing that charges the entrepreneur an application fee is live. Upcoming federal grants are labeled Forecast and never shown as open.
api #423, #435–#437 · www #110
Live
Nov 21
Application tracker: entrepreneurs set the stage of each application from Smart Apply or the opportunity page.
www #90, #109
Live
Impact
Date
Deliverable
PR or run
Status
Nov 14
Data care: the chat service now answers only calls from runwei.io.
chat #12 · www #85
Live
Nov 15, 18
Admin portal: sign-in now keeps Impact, ROI and Engagement loading, and the portal carries the Runwei brand.
admin #107, #109
Live
Nov 16
One outcome record per entrepreneur per opportunity, including “drafted” when Runa helps start an application.
api #382 · chat #33
Live
Nov 16–21
Partner impact feed: each partner sees outcomes for its own entrepreneurs, with every partner in the picker.
api #383, #431 · admin #108, #111
Built, switched off
Nov 16–17
Distribution: LinkedIn drafts for new funding that wait for approval, a daily featured opportunity at least seven days before its deadline, and posts that link to the public opportunity page.
api #391, #393, #394, #400, #405
Merged
November 1 – 13
Ward Infinity reports finished, new partner pages for Granted for Growth and Watson, Notetaker fixes from the fellows, and a cleanup of every repository.
Intake
Date
Deliverable
PR or run
Status
Nov 3
Granted for Growth event page and template.
api #336 · events #37
Live
Nov 4–5
Microsites from a partner intake link: staff paste the link and the page is drafted for them.
api #338 · admin #102
Live
Nov 5
Courtesy welcome and partner consent for members a partner uploads (Aixa’s October 25 spec).
api #321 · www #77
Live
Nov 6–20
Watson Institute: info-session sign-up at /watson, the Truist Fellowship readiness check, and the Fellowship progress-update page.
api #346, #354–#356 · events #48, #49
Live
Nov 13
Accessibility on public pages: keyboard users can skip to the content, screen readers find the main section, and the feedback button is labeled.
www #83
Live
Opportunities
Date
Deliverable
PR or run
Status
Nov 3–5
Ingestion follows Aixa’s October 25 extraction SOP everywhere. Opportunity Grabber 0.2.0 shows the evidence for every field, checks it against rules, and offers Publish, Draft or Archive.
Certification Notetaker: the 44-item A1 retest, the November 4 evidence run and the Arabic session fixed; one interview for all three parts; Aixa’s November 5 asks (Arabic input help, tap-to-learn terms, checks before submit); the crisis banner only on real risk signals.
notetaker #21–#23, #25–#28, #30
Merged
Nov 5
Deadlines are read on their stated day, so a closed listing never looks open.
api #340 · www #78
Live
Impact
Date
Deliverable
PR or run
Status
Nov 1–5
Ward Infinity progress reports finished: watermark, rights notice and report ID, verification symbols, two review rounds, Lefcourt Medical AI and Runwei’s NCRC grants added, and a print layout.
events #29–#36, #40–#43
Live
Nov 5
Platform overview page at /platform.
events #44
Live
Nov 5–6
Upkeep: the retired email provider and unused code removed from the 20 repositories that held them, so one email service remains.
api #342, #343, #345 · 20 repositories
Merged
Nov 6
Watson report built on the November 4 template.
events #46
Live
October 7 – 31
Published in the October editions; regrouped here so the whole period reads in one place.
Intake
Date
Deliverable
PR or run
Status
Oct 16
Beyond the Block microsite for Black Innovation Leaders of Florida, on its own Runwei address.
api #281, #282 · events #9–#12
Live
Oct 16
A launch kit for every event page: partner email, LinkedIn and WhatsApp posts, QR code and tracked links.
events #13 · api #284–#286
Live
Oct 23
EAC @ LDCENY cohort intake page, and Grants 101 for the Queens Public Library incubator.
events #14, #16 · api #305, #309, #311
Live
Oct 23
Microsite builder: Runwei staff create and publish partner microsites with no JMCB step, and every microsite belongs to a partner account.
Public links moved onto Runwei addresses, with a test that blocks any other address.
events #25
Live
Opportunities
Date
Deliverable
PR or run
Status
Oct 9
Quality and link audit across the whole catalog, with eight fixes.
api #209–#214 · SDG #9
Done
Oct 10–18
The AI reviewer switched on, then taught by the human reviewer’s decisions; the review queue went from 912 to 236, and closed listings now leave within a day.
api #224, #229–#232, #291, #293
Live
Oct 11
Every live listing labeled by who it is for (entrepreneur, institution, research, government); entrepreneur listings come first.
api #233, #234
Live
Oct 11–15
Two sourcing waves: federal, SSBCI, NY ESD and state sources, contracts and set-asides, and both opportunity inboxes. Entrepreneur listings rose from 995 to 1,156 in the first wave.
api #235–#261 · www #72 · ingest #7
Live
Oct 17
Cards without a logo show a funder tile instead of a stock picture.
www #74 · api #288
Live
Oct 30–31
Certification Notetaker: all eleven tester issues fixed and retested, and two more found and fixed.
notetaker #19, #20
Live
Impact
Date
Deliverable
PR or run
Status
Oct 8
Partner dashboards now show microsite registrations and Smart Apply activity, and are switched on.
api #204, #205 · admin #94
Live
Oct 12
Data care: security headers on every site, and stray log and settings files removed.
api #263, #264 · www #73 · admin #97, #98
Live
Oct 29
Ward Infinity: a one-page progress report per entrepreneur, a cohort summary and the update form. A report is shared only on the entrepreneur’s own yes.
api #327
Live
Oct 31
Ward Infinity Impact Profile, with a sales kit for Aixa.
PDF report
Delivered
July 22 – October 6, in brief
Published in earlier editions, in brief.
July 22 – September 4. Sign-in failures on runwei.io fixed; extraction accuracy raised from 7% to 85% on Runwei’s own tests; automated checks restored on every repository; the first hands-off releases.
August 22 – 26. The Provider Portal, newsletter ingestion, fit scoring, engagement tracking, ranked search and the Certification Notetaker.
Strategy and reviews. The roadmap and market assessment, Capital One Pro Bono scoping, decks and research briefs, and eighteen reviews of Runwei documents.
September 5 – 12. Production mode on, nightly backups and alerts, the waitlist pipeline (26,528 people staged), a test standard for the graduate audit, recommendations shown to entrepreneurs, 26 NYS EAC partners onboarded.
September 13 – 21. The partner Impact and ROI dashboard, access roles, Smart Apply, partner engagement pages and the partner email workflow.
September 22 – October 6. Every industry selectable again, the Agora and DISB pages, the publisher pilot, five tester defects fixed and the DRACIS microsite.